Gilat: connecting manufacturing records across three factories
The reported rollout connected more than 35 databases so operations teams could monitor production remotely and investigate complex products with a shared view of the data.
The manufacturing challenge
Gilat’s account describes satellite ground-station equipment and other complex products manufactured through geographically distributed operations. The team wanted an end-to-end view of production, better remote monitoring and a system that continuously gathered records from multiple sources.
Before the project, analysis was infrequent and time-consuming. Complex products made root cause investigations difficult, and the team wanted better traceability across the supply chain. The goal was to connect the available data without replacing the internal systems that produced it.
The implementation
The source reports a three-month implementation, go-live in three factories and connections across more than 35 databases. One internal employee coordinated the project, while QualityLine carried out the main implementation work and provided a dedicated support team.
The case describes KPI reports, remote monitoring and a detailed handover. It also states that the project did not require changes to Gilat’s internal system or additional hardware or API installation. These are the conditions of this reported deployment; a new project still requires a source-access and integration review.
How the records supported engineering
The team used the connected view for daily monitoring and investigation of yield problems. The account also describes Cp and Cpk reporting for tests, improved traceability, reduced test duration and better visibility for R&D when reviewing product design.
These activities linked operations monitoring with engineering follow-up. A production change could be examined alongside the relevant unit and test history rather than as a disconnected summary.
The reported results and their context
The PDF reports a 12% production-capacity increase in the first year and ROI in less than four months. It also describes yield improvements ranging from 30% to 85%, depending on the product. It does not provide product-level baselines, sample sizes or enough detail to convert that range into percentage-point gains.
A separate 23% customer-outcome figure appears under a satisfaction heading and is described in the accompanying text in terms of complaints and fewer RMA units. Because those definitions are not reconciled, this page does not present it as a precise, standardized satisfaction or RMA metric.
Applying the lesson
For a distributed manufacturing project, agree the site coverage, record identifiers and remote investigation workflow before setting improvement targets. Review manufacturing data integration, manufacturing traceability and test data analytics.
The PDF’s future-version, RMA-process and supplier-expansion statements describe plans at the time of the interview; their subsequent completion is not established by that source.